
First view of impressed current anodes installed above the
tank in
PVC holders to prevent contact with the tank bottom.

Second view of impressed current anodes installed above the
tank
in PVC holders to prevent contact with the tank bottom.

The header cable to the anodes was run up through the vent to
the
outside.

The header cable from the interior anodes was run across the
top
of the tank and down the overflow pipe in conduit strapped to
the
pipe.